Abstract's details
New DORIS-VLBI interference measurements at the Geodetic Observatory Wettzell
Event: 2026 IDS Workshop
Session: DORIS System, Network, and IDS updates
Presentation type: Oral
The DORIS beacon WEUC at the Geodetic Observatory Wettzell is in operation since 2016. Prior to this an extensive site investigation was performed to keep the radiointerferences to a viable level with respect to the VLBI operation. Over the years a successive rise of the ambient RFI level increasingly affects the VLBI receiving system, in particular the VGOS broadband feeds. In this context, a new systematic RFI survey was done. In this talk the impact of the 2 GHz DORIS emission on the TTW-1 VGOS antenna is shown and methods to mitigate these effects are discussed.
Keywords: DORIS-VLBI interferences, RFI, Geodetic Observatory Wettzell
Participation: In person
Back to the list of abstractKeywords: DORIS-VLBI interferences, RFI, Geodetic Observatory Wettzell
Participation: In person